Automatically shuts off the gas supply. PDS (Remote Panel): Optional unit for remote monitoring. 🔌 Wiring and Connection Guide
The SAKZ-MK-2 typically uses connectors for fast, "plug-and-play" installation. Follow these steps for a standard setup: Valve Connection:
If using a remote panel, connect it to the BSU or the last sensor in the chain to receive status signals. Plug the BSU into a standard 220V outlet .
Install near the ceiling (gas is lighter than air).
The valve is usually normally open and requires a manual reset after a trip. Sensor Interconnection:
Sakz - Mk 2 Shema Podkljuchenija
Automatically shuts off the gas supply. PDS (Remote Panel): Optional unit for remote monitoring. 🔌 Wiring and Connection Guide
The SAKZ-MK-2 typically uses connectors for fast, "plug-and-play" installation. Follow these steps for a standard setup: Valve Connection: sakz mk 2 shema podkljuchenija
If using a remote panel, connect it to the BSU or the last sensor in the chain to receive status signals. Plug the BSU into a standard 220V outlet . Automatically shuts off the gas supply
Install near the ceiling (gas is lighter than air). sakz mk 2 shema podkljuchenija
The valve is usually normally open and requires a manual reset after a trip. Sensor Interconnection: